On Air Now Non-Stop Music 1:00am - 6:00am
Now Playing Electric Light Orchestra Confusion

Latest A57 Link Road Project updates

National Highways have released the next phase of works on the A57 Link Road Project.

1) Upcoming plant crossing work 

  • To build the new link roads, large volumes of soil and earth need to be moved across Mottram Moor. 
  • To do this safely and efficiently, a temporary plant crossing - which is a short road for construction vehicles - will be installed. The crossing will remain in place until the end of the project. 
  • The crossing will be used throughout the scheme, but it will be needed more often during the drier months. 

2) Overnight roadworks at Mottram Moor 

In March a concrete foundation for the plant crossing was built. To make it fully operational overnight work needs to be completed from Monday 27th April to Friday 1st May. During these works:  

  • temporary traffic lights will operate between 8pm and 6am 
  • Mottram Moor will be reduced to a single lane with vehicles passing through one direction at a time 
  • temporary traffic lights will also be used at the junction of Back Moor and Gun Inn 
  • Pedestrian access will always be maintained.  

3) Woolley Bridge traffic lights and piling 

  • Temporary two-way lights will be installed at Woolley Bridge between Tuesday 28th and Wednesday 29th April. 
  • Between 9.30am and 3pm, drivers will run in single file through the lights. Short delays to journeys will be expected. 
  • The temporary lights are required to widen access which will allow for piling works to start. They are scheduled to begin at Woolley Bridge from Monday 5th May.  
  • These works are expected to continue until the end of July 2026.

More from Glossop Chronicle

Weather

  • Tue

    13°C

  • Wed

    15°C

  • Thu

    17°C

  • Fri

    20°C

  • Sat

    20°C